-
- Monday, September 7, 2009
- OCC2- Transferring OCC to OCC2- Eng-razi Sayyed
- The attached presentation describes the transfer from OCC version 1 ( non-SCORM) to OCC2 (SCORM compliant) and also other changes made. The presentation was prepared and delivered by Eng. Razi Sayyed on April 29 in the second workshop for the project.
-