An-Najah Blogs :: maher-jalal-khammash http://blogs.najah.edu/author/maher-jalal-khammash An-Najah Blogs :: maher-jalal-khammash en-us Sat, 27 Jul 2024 15:06:08 IDT Sat, 27 Jul 2024 15:06:08 IDT [email protected] [email protected] An Efficient Parallel Gauss-Seidel Algorithm for the Solution of Load Flow Problems.http://blogs.najah.edu/staff/maher-jalal-khammash/article/An-Efficient-Parallel-Gauss-Seidel-Algorithm-for-the-Solution-Published ArticlesIn this paper a parallel algorithm for solving the load flow problem of large power systems is presented This algorithm uses a parallel virtual machine implemented as a distributed system built from readily available PCs The proposed Algorithm is based on the Gauss-Seidel Algorithm usually used in the solution of load flow problems This algorithm is parallelized by distributing the bus voltages among a set of processors such that each processor will be working on 1n of the bus voltages in the circuit where n is the number of processors Since it is virtually impossible to obtain a parallel processing machine in our country the algorithm is developed over a distributed system which consists of a network of PCs Even though the communication overhead is much more than that in a real parallel machine the results show that large power systems can be solved in much less time compared with the time required for sequential algorithm usually used and that with proper selection of the number of processors the execution time is reduced by almost a factor of the number of processors Design of an electrical network for the West Bank of Palestine with the selection of the optimum site of the generating power plant.http://blogs.najah.edu/staff/maher-jalal-khammash/article/Design-of-an-electrical-network-for-the-West-Bank-of-Palestine-with-the-selection-of-the-optimum-site-of-the-generating-power-plantPublished ArticlesThe aim of this study is to design an electrical network for the west bank of Palestine selecting the optimum site of the generating power plantThe required network should have the optimum configuration and realize the economical and technical requirementsIt should provide the consumer with electric energy of high quality reduce the cost of electric energyand have the minimum possible total annual cost